In June 2016, the foundation stone of the plant was laid.
2017年
2月
工厂竣工
The plant was completed in February 2017.
2017年
10月
带料量产
Mass production with material in October 2017.
2018年
1月
正式量产Φ860mm产品
In January 2018, Full-scale production of Φ860mm products.
2018年
9月
Ф860mm石墨化产品量产,与此同时中970mm产品开始试生产
In September 2018 Production of Ф860mm graphitized products scaled up to mass - production lecels. Simultaneously, trial production of Φ970mm products got underway.
2019年
4月
Φ970mm石墨化产品量产
In April 2019, Φ970mm graphitized products are mass-produced.
2019年
11月
Φ1100mm×1100mm 产品开始量产
In November 2019, Mass production of the Φ1100mm×1100mm product began.
2020年
3月
2200mm×700mm×720mm 产品量产
In 2020 In March, 2200mm×700mm×720mm products were mass-produced.
2021年
Φ1200mm筒子料出产
In 2021, Φ1200mm package material production.
2022年
3月
Φ1250mm石墨化产品量产
In 2022, Φ1250mm graphitized products are mass-produced.
2023年
2200mm×850mm×720mm量产
In 2023, 2200mm×850mm×720mm mass-produced.
2024年
7um半导体用石墨研制成功并量产
In 2024, Graphite for 7um semiconductors was successfully developed and put into mass production.